The client, a natural gas producer in Western Canada, engaged Autopro to conduct a study of the Burner Management Systems (BMS) in use at one of its gas processing facilities. The study was being done to identify the requirements to upgrade two power boilers to comply with CSA B149.3-10, the Canadian Standards Association code for the field approval of fuel-related components on appliances and equipment.

The final report included a complete scope of work and technical specifications to bring each evaluated boiler, fired heater, and furnace into compliance, as well as a detailed summary of associated costs.